The complete decision guide
Video Archive Buying Guide for Editors and Studios
Buy an archive around recovery, editable-project dependencies and a clear retention agreement.
Start here
Choose the right starting point
An archive is useful when you can recover the work you promised to retain. Final exports, editable timelines, camera media and rights records have different purposes. Decide which belong in the retained project before estimating capacity or cost.
Run one restore drill before relying on a storage arrangement. Retrieve a project to a different location, open it and identify missing dependencies. Document the result and retain independent copies appropriate to the risk; a hosted library alone should not be assumed to provide every backup capability.
Ideal transfer time for a 100 GB restore
Time = 100 decimal GB × 8,000 ÷ Mbps ÷ 3,600. Assumes constant available throughput; verification, overhead and contention add time. These are illustrative calculations, not measured customer results or plan limits.
Your evaluation
Turn the trial into a decision
Use the guides below to create an acceptance record for the work you do. Mark each requirement as essential, optional or outside the scope of the service. Test the essential items with your own files before moving an active client project.
Keep a written result for both a successful handoff and a failed one. If an important step needs another tool or a manual process, include that work in the comparison. Choose a paid plan when the verified workflow and current allowances fit your workload.
Continue with the existing workflow guide →Product fit
Where uncompressed.io fits
uncompressed.io paid plans include cold capacity. Archived films must be restored to available hot space before playback or review; transfer time varies. Plan capacity for active work and restores together, and check the current pricing and archive terms.
Product reference: the existing uncompressed.io workflow guide. The scenarios and worksheets on this page are illustrative editorial examples, not customer testimonials.
Make the next step concrete
Test it with one real project.
Check the client handoff, then choose the plan that matches the work you need to deliver.
